Scratchpad vs Dooly for Engineering Firm RFP Pipelines
For an engineering firm that wins work through RFPs, Scratchpad keeps several active bids visible in one grid, and Dooly captures what came out of a site visit so it shapes the proposal. The pipeline runs on a longer clock than a software sale: an RFP, a pre-bid meeting or site visit, then a proposal matched to a specific scope of services.
Scratchpad and Dooly address two different parts of that drift: one keeps several active bids visible in one place, the other makes sure what came out of a site visit actually shapes the proposal that follows it.
Vendors Covered in this Article
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
How do RFP deadlines change an engineering pipeline?
A public agency or private developer sets the RFP release date, the pre-bid meeting date, and the submission deadline, and a firm's pipeline has to bend around that schedule rather than the other way around. That means a lot of opportunities sit in a genuinely inactive state for weeks between the pre-bid meeting and the submission deadline, which can look like a stalled deal in a normal CRM view even when nothing is actually wrong.
The practical effect is that a firm's pipeline review has to distinguish between an opportunity that has gone quiet because the relationship cooled, and one that is simply waiting on a deadline that has not arrived yet, a distinction most out-of-the-box Salesforce views were never built to make.
Where Site Visit Details Get Lost Before the Proposal Is Written
A pre-bid site visit often surfaces details that never make it into the RFP document itself: an access constraint, a preference the agency's project manager mentioned informally, a competing firm's reputation on a similar project nearby. Whoever writes the technical proposal weeks later needs that context, and if the engineer who attended the site visit did not write it down clearly, it gets reconstructed from memory or left out entirely.
Dooly's note templates can be built around a firm's own pre-bid checklist, capturing what was said at the site visit and linking it to the opportunity, so the proposal writer has more than the RFP document alone to work from.
Record these details after every pre-bid site visit:
- Any access constraint on the site that the RFP document itself never mentions.
- A preference the agency's project manager mentioned informally during the visit.
- A competing firm's reputation on a similar nearby project, if it came up in conversation.
- Who attended from the firm, so whoever writes the technical proposal knows whom to ask for context.
Scratchpad for Tracking Several Active Bids at Once
A firm pursuing eight or ten RFPs at different stages benefits from seeing every bid's stage and submission deadline in one grid, rather than checking each opportunity separately to confirm what is due this week. Scratchpad's bulk editing makes it fast to update stage and next steps across a batch of bids after a round of pre-bid meetings, which for a firm running several pursuits at once during a busy RFP season can save real time in a single sitting.
Its Deal Spotlight view is also useful for flagging bids with a submission deadline approaching and no confirmed go or no-go decision logged, which is a specific, fixable gap in an RFP-driven pipeline.
When should an engineering firm roll out a tool like this?
Unlike a SaaS sales team that can roll out a new tool at any point in a steady weekly cadence, an engineering firm should time a rollout around its RFP calendar. Introducing either tool in the middle of a heavy submission week, when every engineer is focused on finishing a proposal, guarantees low adoption. A quieter stretch between major bid deadlines is a better window to get the team comfortable with a new note template or grid view before the next busy cycle starts.
Start with whichever gap is costing more bids: if proposals routinely miss detail from the site visit, start with Dooly; if bids are well understood but the pipeline looks stale by submission week, start with Scratchpad. Either way, give the whole team a full pursuit cycle to adjust before judging whether it actually stuck.
What a Win Rate Improvement Is Actually Worth Here
Sales and business development spend for a services firm is a real cost even without a dedicated sales team, since it comes out of billable engineering hours instead. A general pipeline coverage baseline of 3x to 4x is a reasonable target for firms that can measure it, though many engineering firms track win rate on RFPs directly instead1. Either way, the practical payoff of fixing a proposal-detail gap or a stale pipeline is the same: fewer bids lost to a competitor who simply captured the site visit better and wrote a more specific proposal.
What Good Looks Like
A well-run RFP pipeline has every active pursuit's stage, go or no-go decision, and submission deadline logged accurately, with site visit details reflected in the proposal rather than lost to memory.
Building The Capability (5-Stage Skill Ladder)
How to Get Started
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
Frequently Asked Questions
Can Dooly's templates be built around a firm's own pre-bid checklist instead of a sales framework?
Yes, Dooly supports custom templates alongside standard ones like MEDDIC, so a firm can structure notes around its own pre-bid questions, site conditions, agency preferences, competing firms, rather than a generic sales qualification framework.
Does Scratchpad distinguish between a stalled bid and one waiting on an RFP deadline?
Only if that distinction is logged as the next step. Scratchpad shows whatever fields exist on the opportunity, so a team has to actually note 'awaiting submission deadline' for the grid to reflect it accurately.
How many active RFPs justify adopting a tool like this?
Once a firm is tracking more than five or six active pursuits with overlapping deadlines, keeping each one current through native Salesforce alone usually starts costing enough staff time that a grid view like Scratchpad's is worth piloting.
Sources
Where we quote a benchmark, we show its source. Other figures in this guide are estimates or general guidance, so check them against your own numbers.
- Pipeline coverage ratio norms. Clari — Pipeline Coverage Ratio best practices, 2025.
Related Guides
ZoomInfo vs Cognism for Engineering Firm Pursuit Lists
How civil and structural engineering firms should weigh ZoomInfo against Cognism when the real cost is the week a proposal lead spends chasing a stale contact.
Fathom vs Fireflies for Civil and Structural Engineering Firms
A step-by-step setup guide for civil and structural engineering firms choosing between Fathom and Fireflies for scoping and RFP calls.
Paying Seller-Doer Engineers Without Discouraging Billable Work
Engineering firms run on seller-doers who win the work and then bill it. Here is how to reward origination without hurting utilization, and which tool fits.
Sequencing a Civil Engineering Project Without Missing a Handoff
Comparing GuideCX and Arrows for civil and structural engineering client onboarding, from survey data to permitting handoffs.
Apollo vs ZoomInfo for Engineering Firms: Public Clients Differ
Public agencies rarely appear in a contact database. Here's how a civil or structural engineering firm should split public and private client sourcing.
Close or Pipedrive for a Civil Engineering Firm's Pursuit Pipeline
A decision guide for civil and structural engineering firms choosing between Close and Pipedrive to track RFP pursuits and owner and GC relationships.